- Details
- Hits: 8265
Got an early start, on the road by half 8. It was bright and dry and we had a tailwind. We headed over to Coldstream for a BCQ then headed down the River Tweed joining the NCN1 to Berwick. We arrived with two hours to spare before the train so we had time for lunch in a café. There was a pipe band playing and the streets were very busy.

